Package Manager SCADA for a 250MWh Battery Electrical Storage System. Responsible for the Control System design and Control Philosophy for TransgridBW, one of Germany's leading transmission system operators.
Package Manager for the Electrical Transmission System & SCADA for the 600MW offshore wind parks Changfang and Xidao as well as the 300MW Zhong Neng in Taiwan. Responsible for Transmission System Design, Onshore Substation, SCADA and Cyber Security.
Senior Authorised Person for Iberdrola Deutschland GmbH. Building up the operational infrastructure and processes of the 350MW Wikinger wind park built by Iberdrola and Scottish Power. Establishment of the Onshore Control Center and related infrastructure.
Lead Senior Authorised Person and Commissioning Manager. Responsible for safe onshore and offshore commissioning of the 400MW Wind Park Veja Mate in the German North Sea. Built up the operational infrastructure including the Onshore Control Center to operate the unmanned far shore wind park.
Project Lead for implementation of an operational ICT architecture including cyber security compliance for a 400MW offshore wind park in the German North Sea. Implemented Enterprise Portal, Top Level SCADA, Enterprise Asset Management, Permit to Work, ERP and Workforce Management System integration.
Subject Matter Expert supporting the tendering of an MPLS IP network for interconnection of all substations and SÜWAG locations. Developed strategy for a central Network Operation Center (NOC) and an integrated IT/OT and cyber security architecture for the complete SÜWAG Group.
Subject Matter Expert for the Ministry of Energy and Water (MINEA). Developed a Grid Defence Plan for the Transmission System Operator RNT. Established a Cyber Security Initiative with Assessment and End-to-End Security Concept. Created a Draft Grid Code.
Subject Matter Expert in the "Full Potential" project for Swissgrid, Switzerland's national transmission system operator. Focus on process optimization and ICT architecture for operation of the transmission grid and electricity market.
Principal Consultant and leader of the "Procurement Strategy" work package for EnBW's 1,200 MW offshore wind development. FEED Study to technically and commercially optimize the wind farm design for "Hochsee Windpark He Dreiht" and "Hochsee Windpark Nordsee" with up to 199 turbines each.
HVDC DolWin3 is a high voltage direct current link station to transmit offshore wind power to the German mainland. The project features Voltage-Sourced Converters with DC ratings of 900 MW, ±320 kV and a total cable length of 160 km, with one converter station built on a platform in the sea.